Animal Shelter
On April 7, 2008, the Town of Cornelius approved a plan to construct a 4,258 square foot animal shelter at the end of Meridian Street. Status as of 6/6/08: Elevations have been reviewed by the Architectural Review Board. The next phase will be review of construction documents which is expected to take 2-3 months.
|
|
Antiquity
Status: Town Board approved on January 22, 2008 The applicant requested a Town Center Parallel Conditional Use District Rezoning and Major Subdivision to change the commercial area that was shown in the regulating plan that was part of the original conditional use zoning process. The Antiquity Conditional District was approved in 2001 and amended in 2002.
|
|
Bailey Commerce Park (SUB 03-07)
Status: Approved on October 1, 2007 Legacy Pointe Properties, LLC requested subdividing approximately 41 acres for permitted uses within the Industrial Campus zoning district.
|
|
Bailey Road High School (SITE 15-07)
Status: Approved on October 15, 2007 Charlotte-Mecklenburg Schools requested a Conditional Use Permit to construct a 2,000 student public high school that would include a football stadium, softball/baseball fields, soccer field, multipurpose field, and 8 tennis courts.
|
|
Bailey's Glen
Status: Approved on 2/5/07 |
|
Bluff Point
|
|
Caldwell Depot (REZ 03-07)
Status: Approved on June 4, 2007 The applicant proposed rezoning two parcels to Village Center Conditional District to allow for 4-one story, 7,500 square foot buildings (two buildings per lot).
|
|
Community One Bank (SITE 23-07)
Status: Approved on September 10, 2007 The applicant requested a major architectural variation to modify the existing elevation.
|
|
Cornelius-Lemley Fire Station #1
Status as of 6/9/08: Construction is almost complete on the new fire station, which was approved by the Town Board of Commissioners on 12/18/06.
|
|
Cornelius Station
Status: Approved on 10/15/07 |
|
Courtyard at Kenton Place (REZ 07-07)
Status: Approved by the Town Board on March 17, 2008. The applicant will demolish the existing 48,180 square foot Palace Theatre and construct three buildings of three floors each (10,000 square feet per floor), totaling 30,000 square feet per building and a 19,000 square foot urban park.
|
|
Edinburgh Square (REZ 07-06)
Status: Approved on September 17, 2007 The applicant requested rezoning 2 parcels of land from Neighborhood Residential to Neighborhood Mixed-Use for the purpose of constructing 2 buildings.
|
|
Joy's Serenity Point
Status: Approved on 6/6/06. |
|
Kenton Place (REZ 04-07)
Status: Approved on August 20, 2007 The applicant proposed changing a previously approved site specific plan to develop (2) mixed-use buildings totaling 50,400 square feet.
|
|
Rocket Carwash
Status: Town Board approved on May 5, 2008 The applicant will construct a 7,710 square foot carwash and car service (oil and lube) center along Statesville Road (Highway 21). 6,210 square feet will be used for carwash and car service (oil and lube) uses while 1,500 square feet will be used for sales/reception areas. The site proposes a three bay wash area, detail area, sales/reception area and vehicle service area.
|
|
Verizon Cell Tower (SITE 22-07)
Status: Approved on November 5, 2007 The applicant requested a Conditional Use Permit to construct a 115' unipole tower for wireless communications.
|
|
The Village at Lake Norman
Status: Approved on April 23, 2008
|
|
Walgreens
On 5/14/07 the Town of Cornelius approved the request from Walgreens to modify the parking configuration on the previously approved Conditional Use Permit allowing a drive-through facility. Status as of 6/9/08: The construction drawings for the proposed modified parking configuration are under review by the Town and County.
|
|
Westmoreland Mini-Storage (SITE 30-07)
Status: Approved on November 12, 2007 The applicant is requesting a reduction in the amount of retail space and parking required on the previously approved plan.
|
|
Westmoreland Storage (SITE 04-07)
Status: Approved on May 7, 2007 The applicant proposed constructing a 94,662 square foot, three story building that would accommodate retail and mini-storage. |